User Tools

Site Tools


blog:blogkatherine_maintanance_trip_june_15-24

This wiki is not maintained! Do not use this when setting up AuScope experiments!

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
blog:blogkatherine_maintanance_trip_june_15-24 [2014/06/23 10:50]
liza
blog:blogkatherine_maintanance_trip_june_15-24 [2014/06/27 06:09] (current)
Brett Reid [Ke maintanance trip]
Line 23: Line 23:
  
   - mk5ke: bank B back plane failure. Affected disks 4/5 and 6/7. Do not use for conditioning.   - mk5ke: bank B back plane failure. Affected disks 4/5 and 6/7. Do not use for conditioning.
 +  - mk5-2ke: module doesn'​t go all the way in to bank B.
   - DBBC: "stuck bit" and bit statistics problems related to VSI OUT connectors: ch15 (S) with VSI1 (rear) -- was problematic from the beginning, ch5 (X) with VSI2 (front) emerged after the inspection and refitting of FILA OUT board.   - DBBC: "stuck bit" and bit statistics problems related to VSI OUT connectors: ch15 (S) with VSI1 (rear) -- was problematic from the beginning, ch5 (X) with VSI2 (front) emerged after the inspection and refitting of FILA OUT board.
    
  - DBBC: suppresses the amplitude of 10-kHz pcal tone (first) in each band.  - DBBC: suppresses the amplitude of 10-kHz pcal tone (first) in each band.
- 
- - Modules: hob+025/​6000 has fault in disks 6/7; bkg-0015/​1480 took forever to condition. Are labelled as broken and prepared for repair. bkg-0015/​1480 should be reprofiled into higher capacity disk. 
  
  - Maser: replaced the '​switches'​ unit and AC/DC converter, cavity tuning and frequency adjustment performed, new standby batteries were installed. ​  - Maser: replaced the '​switches'​ unit and AC/DC converter, cavity tuning and frequency adjustment performed, new standby batteries were installed. ​
 +
 +**Status:**
 +
 + - mk5-ke is a main recorder connected to VSI2 on FILA OUT. Channel 5 have a stuck bit. 
 + - 5MHz signal for pcal is connected directly to the second output of the maser through the synch port.
 +
 {{tag> backend}} {{tag> backend}}
  
Line 58: Line 63:
  
  - Control room: mk5 light for reading module labels is no longer connected to exterior light switch on ipske. It now switches on ''​pdu1ke.phys.utas.edu.au''​ and is labelled ''​light int''​  - Control room: mk5 light for reading module labels is no longer connected to exterior light switch on ipske. It now switches on ''​pdu1ke.phys.utas.edu.au''​ and is labelled ''​light int''​
 +
 + - Installed 2 of power distribution units (PDU). These are like an 8 way power board that have individually switched outputs. They can be switched from a web interface at the following 2 links:
 +\\ [[http://​pdu1ke.phys.utas.edu.au/​outlet.htm|pdu1ke.phys.utas.edu.au/​outlet.htm]]
 +\\ [[http://​pdu2ke.phys.utas.edu.au/​outlet.htm|pdu2ke.phys.utas.edu.au/​outlet.htm]]
 +
 +The user is admin and the password is the same one we use for the internet power switches.
 +\\ PDU1KE so far has wifi, cduke (network maint computer) and the interior light.
 +\\ PDU2KE so far has mk5-2ke and the GPIB controller.
  
  