This shows you the differences between two versions of the page.
Both sides previous revision Previous revision Next revision | Previous revision | ||
blog:dbbc_workat_yg_2013_jul_25 [2013/07/26 23:04] Brett Reid |
blog:dbbc_workat_yg_2013_jul_25 [2013/08/07 00:05] (current) Brett Reid |
||
---|---|---|---|
Line 1: | Line 1: | ||
====== DBBC work at Yg, 2013 Jul 25 ====== | ====== DBBC work at Yg, 2013 Jul 25 ====== | ||
DBBC has had its CPU board replaced for the cooler ATOM processor board from Advantech. | DBBC has had its CPU board replaced for the cooler ATOM processor board from Advantech. | ||
- | The earthing of the VSI cable connector has been impemented. | + | The earthing of the VSI cable connector has been implemented. |
Jamie configured and tested the DBBC. He started a test schedule and there have been no clock jumps in 24 hours. \\ | Jamie configured and tested the DBBC. He started a test schedule and there have been no clock jumps in 24 hours. \\ | ||
Line 10: | Line 10: | ||
July 27. Today will be warmer. Randall will come and assist with creating Electrical disturbances. I will be here till Monday, performing Yg maintenance this weekend. \\ | July 27. Today will be warmer. Randall will come and assist with creating Electrical disturbances. I will be here till Monday, performing Yg maintenance this weekend. \\ | ||
+ | |||
+ | August 7th. Completed first experiment since maintenance today. R1597. There were no clock jumps. It is probably fixed. \\ | ||
Brett Reid | Brett Reid |