This shows you the differences between two versions of the page.
Next revision | Previous revision | ||
handover:aug020 [2016/01/11 05:42] Jesse Swan |
handover:aug020 [2016/01/12 01:51] (current) Jesse Swan |
||
---|---|---|---|
Line 3: | Line 3: | ||
**Hobart** | **Hobart** | ||
- | Module: HOB+0104, xx GB | + | Module: HOB+0104, 0.77 GB |
* UT0630 Experiment started OK (JS) | * UT0630 Experiment started OK (JS) | ||
+ | |||
+ | |||
**Katherine** | **Katherine** | ||
- | Module: HOB+0128, 0 GB | + | Module: HOB+0128, 0.77 GB |
- | * UT0630 Experiment started OK (JS) | + | * UT0630 Experiment started but with large clock offsets (JMC) |
+ | * UT0632 Experiment halted to reconfigure DBBC. | ||
+ | * UT0638, schedule resumed, UT0652 after problems with checkmk5 procedure but clock drifts continue. | ||
+ | * 11:44 UT - Schedule stopped as delay differences kept drifting, with DBBC reset achieving nothing. (Ellen) | ||
+ | * UT2310 Halted for DBBC reset, delay differences still drifting (Bryn) | ||
+ | * UT0004 Experiment Halted, delay differences drifting faster. | ||
**Yarragadee** | **Yarragadee** | ||
- | Module: HAY-0050, 0 GB | + | Module: HAY-0050, 0.64 GB |
* UT0630 Experiment started OK (JS) | * UT0630 Experiment started OK (JS) | ||