DIM crashed on yg (prior to pointing check) returned “error m5 -23 mk5cn: error openingg, mark 5 probably not running”. Restarted DIM

Turns out the above DIM crash was probably due to a module swap (to 32TB) at yg.

I went full potato and reset the hb pcfs when I saw “no pcfs activity for xx” not realising it was due to a break between scans: probably lost scan 223-0709 because of this :-(

First scan for Katherine (0312-770 @ 07:00:00) did not occur as the target was below horizon(?) for entire length of scan.

Yg had a mk5 malfunction at 223.10:19 during scan 1037a “error m5 -104 mk5cn: time-out, connection closed”. PCFS restart, DIM restart.