This shows you the differences between two versions of the page.
Both sides previous revision Previous revision Next revision | Previous revision | ||
handover:aust41_42 [2014/08/17 04:06] Warren Hankey |
handover:aust41_42 [2014/08/17 05:32] (current) Ross Turner |
||
---|---|---|---|
Line 10: | Line 10: | ||
ATTENTION! Looks like module in bank B USN+0224 has bad soft VSN (name too long warning) will need to sort out when there is a substantial gap in scans. | ATTENTION! Looks like module in bank B USN+0224 has bad soft VSN (name too long warning) will need to sort out when there is a substantial gap in scans. | ||
- | Aust42 commenced on bank B module USN+0224. | + | Aust42 commenced on bank B module USN+0224, as above. |
Hb: | Hb: | ||
Line 17: | Line 17: | ||
Module changed in A to HOB+0023 6 TB ready for aust42 by Warren on Saturday. | Module changed in A to HOB+0023 6 TB ready for aust42 by Warren on Saturday. | ||
+ | |||
+ | Hb automatically changed to bank A for start of scan 229-0530. | ||
Yg: | Yg: |