Line 20: | Line 20: | ||
Hobart (12m) | Hobart (12m) | ||
- | * 04:38 UT: wiring error of pps at Hobart was corrected. Don't know what the impact was before | ||
* Recording to 6 TB module HAY-0055 in bank B, +0 GB (Chris) | * Recording to 6 TB module HAY-0055 in bank B, +0 GB (Chris) | ||
* Anemometer is not connecting (Liza) | * Anemometer is not connecting (Liza) | ||
+ | * RFI: common problem in ch 14, 15 (0-15) (Liza) | ||
+ | * 04:38 UT: wiring error of pps at Hobart was corrected. Don't know what the impact was before | ||
+ | * 05:58UT: RFI: new indication in channel 11 (0-15), periodically occuring spike and phase errors. Was noticed also once before (RD1409 or aust50) (Liza) | ||