This shows you the differences between two versions of the page.
Both sides previous revision Previous revision Next revision | Previous revision | ||
handover:crds74 [2014/12/10 05:00] Ross Turner |
handover:crds74 [2014/12/10 11:59] (current) Jesse Swan |
||
---|---|---|---|
Line 5: | Line 5: | ||
* Data volume at beginning: 0.00 | * Data volume at beginning: 0.00 | ||
* UT 17:10 Sched start. First scan 343-1719 (-13.4 GB) (JS) | * UT 17:10 Sched start. First scan 343-1719 (-13.4 GB) (JS) | ||
- | * 22:00 UT: Problem with field system, could not connect (Ross). | + | * 22:00 UT:e-remote control not working at Mt Pleasant (Ross). |
Hobart 26m: | Hobart 26m: | ||
Line 12: | Line 12: | ||
* UT 17:10 Sched start. First scan 343-1719 (-13.4 GB) (JS) | * UT 17:10 Sched start. First scan 343-1719 (-13.4 GB) (JS) | ||
* 04:47:50 UT: Lightening strike knocked out mark 5. Missed scans after 344-0440, next good scan 344-0509 (Ross). | * 04:47:50 UT: Lightening strike knocked out mark 5. Missed scans after 344-0440, next good scan 344-0509 (Ross). | ||
+ | * Mark 5 A may need power cycle upon lightening strike, doesn't restart itself (Ross). | ||
Katherine 12m: | Katherine 12m: | ||
Line 17: | Line 18: | ||
* Data volume at beginning: 1.159 GB | * Data volume at beginning: 1.159 GB | ||
* UT 17:10 Sched start. First scan 343-1719 (-13.4 GB) (JS) | * UT 17:10 Sched start. First scan 343-1719 (-13.4 GB) (JS) | ||
+ | * UT 10:36 - Mark5B drifting wildly. Halted schedule. (vk) | ||
+ | * UT 10:54 To fix clock drift, restarted field system, GPIB and Mark 5 with no luck, reset counters and fmset with no luck, had to restart DBBC, finally fixed the problem. (Imogen) | ||
+ | * UT 11:50 - Schedule resumed. Missed scans: 344-1027 to 344-1141, corresponding to ~90 GB (vk) | ||
Yarragadee 12m: | Yarragadee 12m: |