User Tools

Site Tools


handover:dynamic_schedule_ds275

This wiki is not maintained! Do not use this when setting up AuScope experiments!

This is an old revision of the document!


Dynamic Schedule DS275

Hobart

Module: HOB+0097, unknown starting disc position

  • A few scans still slewing during scans. (Ellen)

Katherine

Module: ULVBI-29, unknown starting disc position. USN-0062 (second disk) 0.000 GB

  • Module filled up so schedule stopped until someone can put another module in. (Ellen)
  • According to the logs, the last scan before it cut out was 275-0459. (Ellen)
  • 02:00 UT - Schedule resumed, first scan 276-0201 (Ross)
  • 02:11 UT - Large offset between formatter and maser delays, but it is stable (Ross)

Yarragadee

Module: HOB+0125, unknown starting disc position

  • A few scans still slewing during scans. (Ellen)
  • 13:49 UT - Tsys bands 09, 10, 12, 13 way too high. (Ellen)
You could leave a comment if you were logged in.
/home/www/auscope/opswiki/data/attic/handover/dynamic_schedule_ds275.1475374311.txt.gz · Last modified: 2016/10/02 02:11 by Ellen Manning