This shows you the differences between two versions of the page.
Both sides previous revision Previous revision Next revision | Previous revision Next revision Both sides next revision | ||
handover:hob010 [2016/12/22 00:05] Warren Hankey |
handover:hob010 [2016/12/22 12:53] Lucas Hyland |
||
---|---|---|---|
Line 7: | Line 7: | ||
* 1730UT experiment started OK (JS) | * 1730UT experiment started OK (JS) | ||
* 23:54 UT drive power switched off, via DESK control (remote vdesk operator unaware of current experiment?), power came back up at 23:56 UT and telescope back on scheduled source (Warren) | * 23:54 UT drive power switched off, via DESK control (remote vdesk operator unaware of current experiment?), power came back up at 23:56 UT and telescope back on scheduled source (Warren) | ||
+ | * 1040UT mk5cn connection error, Halt experiment and restart mk5ho (Note start DIM with ''DIMino -m0'') (JS) | ||
+ | * Reestablish at 1119UT | ||
+ | * Scans missed 357-1040 through 357-1119 | ||
+ | * 1240UT repeated mk5cn errors, reset mk5ho again (JS) | ||
+ | * lost scans 357-1240 through 357-1255 | ||
**Hobart 12m** | **Hobart 12m** | ||
Line 16: | Line 20: | ||
{{tag>}} | {{tag>}} | ||
+ | * 1040UT accidental closure of DIM server while fixing Ho,fixed with full FS reset at 1105UT | ||
+ | * Scans missed 357-1040 through 357-1105 | ||
~~DISCUSSION~~ | ~~DISCUSSION~~ | ||