User Tools

Site Tools


handover:hob010

This wiki is not maintained! Do not use this when setting up AuScope experiments!

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Next revision
Previous revision
handover:hob010 [2016/12/21 21:37]
Lucas Hyland
handover:hob010 [2016/12/22 18:08] (current)
Lucas Hyland
Line 6: Line 6:
  
    * 1730UT experiment started OK (JS)    * 1730UT experiment started OK (JS)
 +   * 23:54 UT drive power switched off, via DESK control (remote vdesk operator unaware of current experiment?​),​ power came back up at 23:56 UT and telescope back on scheduled source (Warren)
 +   * 1040UT mk5cn connection error, Halt experiment and restart mk5ho (Note start DIM on ''​oper@mk5ho''​ with ''​DIMino -m0''​) (JS)
 +   * Reestablish at 1119UT
 +      * Scans missed 357-1040 through 357-1119
 +   * 1240UT repeated mk5cn errors, reset mk5ho again (JS)
 +      * lost scans 357-1240 through 357-1255
  
 +
 +   * **NOTE: REcording switched to module MAT+0005 at 1255UT (after mk5ho reset) 692 GB of data recorded here**
 **Hobart 12m** **Hobart 12m**
  
Line 15: Line 23:
 {{tag>}} {{tag>}}
  
 +   * 1040UT accidental closure of DIM server while fixing Ho,fixed with full FS reset at 1105UT
 +      * Scans missed 357-1040 through 357-1105 ​
  
 ~~DISCUSSION~~ ~~DISCUSSION~~
  
/home/www/auscope/opswiki/data/attic/handover/hob010.1482356241.txt.gz · Last modified: 2016/12/21 21:37 by Lucas Hyland