User Tools

Site Tools


handover:r1657_ultra_rapid_for_hobart_12m

This wiki is not maintained! Do not use this when setting up AuScope experiments!

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
handover:r1657_ultra_rapid_for_hobart_12m [2014/10/13 16:55]
Vasaant Krishnan
handover:r1657_ultra_rapid_for_hobart_12m [2014/12/03 01:57] (current)
liza
Line 1: Line 1:
 ====== R1657 **Ultra Rapid for Hobart 12m** ====== ====== R1657 **Ultra Rapid for Hobart 12m** ======
 +
 +   * Ultra-Rapid set up procedure:
 +   * http://​auscope.phys.utas.edu.au/​opswiki/​doku.php?​id=operations:​starting_monitoring_ureop
 +   * Also, check the schedule file:
 +   * http://​auscope.phys.utas.edu.au/​opswiki/​doku.php?​id=operations:​documentation.ivs.drudg_ureop
 +
 **Ho** HOB+0102 Data recorded = 10624.396 GB **Ho** HOB+0102 Data recorded = 10624.396 GB
  
-Ultra-Rapid ​set up procedure: +  * 16:54 UT Unable to complete Ultra Rapid setup because write permissions to folder in Tsubuku are not granted. (VK) 
-http://​auscope.phys.utas.edu.au/​opswiki/​doku.php?​id=operations:starting_monitoring_ureop+  * 17:00 UT - Experiment started OKNOTENo autocorrelation plots because of Ultra Rapid. (VK)
  
-Also, check the schedule file: +**Ke** NTO-0007 
-http://​auscope.phys.utas.edu.au/​opswiki/​doku.php?​id=operations:​documentation.ivs.drudg_ureop+  
 +  * 17:00 UT - Experiment started OK(VK)
  
-  ​16:54 UT - Unable to complete Ultra Rapid setup because ​write permissions ​to folder in Tsubuku are not granted.+**Yg** BKG+0136 
 +  * 17:00 UT - Power failure affected DBBC and counter gpibs. (VK) 
 +  * 17:55 UT - First successful scan is 286-1755. Deficiency of 66 GB. (VK) 
 +  * 18:10 UT - Commented out clkoff and maserdelay in midob using pfmed because ​of gpib errors 
 +  * 18:31 UT - Update from Yg with gpib connector fixed. So halting schedule ​to restart fs to estab. comms. 
 +  * 18:46 UT - Schedule restarted. Missed scans 286-1831 and 286-1837aTotal deficiency is ~75 GB
  
-**Ke**+  +SUMMARY  
 +   ​Qcode ​     % of Total   % of Correlated  
 +                  scans          scans      
 +  
 +    5-9            51%            86%  
 +     ​0 ​             7%            12%  
 +   ​4-1,​A-H,​N ​       1%             2%  
 +   ​Removed ​        ​41% ​            ​- ​
  
 ++CORRELATOR_NOTES
 +
 + ​Transfers of Yarragadee data completed on the 27th of October.
 +
 ++STATION_NOTES
 +
 + ​HOBART12 (Hb/d): Ok.
 +
 + ​KATH12M ​ (Ke/a): Ok.
 +
 + ​YARRA12M (Yg/i): Late start at UT 286-1755, due to power failure.
 +
 +
 +
 +Problems: Many problems!
 +
 + ​HOBART12 has at least 7 small clock breaks, but the software ​
 + ​cannot support them all. Breaks are set at 18:15 (+.73 nsec),
 + 06:25 (-.65 nsec), 09:00 (+1.31 nsec), 11:55 (-.52 nsec), and
 + 13:27 (-.58 nsec). And ~85 observations have to be deselected.
 +
 + ​ONSALA60 is very noisy and has many zero codes in X-band. The 
 + log shows high X-band system temperatures.
 +
 + ​NYALES20'​s cable cal is bi-modal at times and has a large break
 + (~84 nsec), similar to R1655. It is not applied, but this may
 + ​produce some systematic errors since the cable and phase cal
 + have an elevation dependence. ​
 +
 + ​TSUKUB32 missed the first 7 hrs due to a typhoon.
 +
 + ​YARRA12M mised the first hour due to a power failure.
 +
 + ​FORTLEZA did not participate;​ problem with azimuth bearings.
 +
 + ​SESHAN25 did not participate;​ antenna motor problem.  ​
 +
 +
 +Parameterization comments: None. 
 +
 +Other comments: None. 
 +
 +-----------------------------------------
 +
 +Session Statistics ​
 +
 +  Observations: ​    6399 scheduled ​
 +                    3707 correlated (in database)
 +                    2796 recoverable (usable)
 +                    2604 used
 +  Session fit:        39.551 ps
 +
 +-----------------------------------------
 +
 +Station Performance ​
 +
 +                           ​Number of Observations
 +
 +                    Scheduled ​  ​Recoverable* ​       Used   % of scheduled
 +                                                              obs used
 +  ​
 +  HOBART12 ​               941           ​720 ​         634        67.4%
 +  KATH12M ​               1111           ​822 ​         770        69.3%
 +  YARRA12M ​              ​1054 ​          ​777 ​         738        70.0%
 +  --------------- ​  ​--------- ​  ​----------- ​   --------- ​      ​------
 +  Station Total** ​       6399          2796         ​2604 ​       40.7%
 +
 +  * Recoverable:​ can be included in the solution. ​
 +  ** Total includes distinct observations only.
 +
 +  MISSED: ​   Station was scheduled, but it did not observe.
 +  NOT CORR:  Station was scheduled but not correlated.
 +  NOT USED:  Usable data was generated for this station,
 +             but the analyst rejected it all.
  
-**Yg** 
  
 {{tag>}} {{tag>}}
Line 19: Line 111:
  
 ~~DISCUSSION~~ ~~DISCUSSION~~
- 
/home/www/auscope/opswiki/data/attic/handover/r1657_ultra_rapid_for_hobart_12m.1413219306.txt.gz · Last modified: 2014/10/13 16:55 by Vasaant Krishnan