User Tools

Site Tools


handover:r1658

This wiki is not maintained! Do not use this when setting up AuScope experiments!

This is an old revision of the document!


R1658

Hobart:

  • Recording to 6TB module USN-0054 in bank A, +0GB (Ross).
  • 17:00 UT: Experiment started OK (Ross).
  • (Jesse) Manual module swap (w/ Brett and Liza) swap at ~00:47:20 UT, schedule restart (line #1758) onsource at 00:51:08.20 UT (Note: This scan was due to start at 00:51:03 UT)

Katherine:

  • Recording to 2TB module IAA-0023 in bank B, +0GB (Ross).
  • 17:00 UT: Experiment started OK (Ross).
  • 19:34 UT: Large jump in time offset, -0.2703s at 19:32:58 and -0.4028s at 19:34:04, up to -1.1178s at 19:40:06, schedule halted (Ross).
  • 19:41 UT: Field system reset, time offset steady at -0.0689s, schedule restarted (Ross).
  • 19:51 UT: Time offset greater than -1s again, schedule halted (Ross).
  • 20:24 UT: Restarted DBBC and resynced field system, time offset stable at -0.0034s, schedule resumed (Ross).
  • Missed scans 293-1932 through 293-2029 (Ross).

Yarragadee:

  • Recording to 2TB module NYAL-019 in bank B, +0GB (Ross).
  • 17:00 UT: Experiment started OK (Ross).
You could leave a comment if you were logged in.
/home/www/auscope/opswiki/data/attic/handover/r1658.1413852985.txt.gz · Last modified: 2014/10/21 00:56 by Jesse Swan