User Tools

Site Tools


handover:r1684

This wiki is not maintained! Do not use this when setting up AuScope experiments!

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
handover:r1684 [2015/04/20 12:29]
liza
handover:r1684 [2015/04/21 22:30] (current)
liza
Line 1: Line 1:
 ====== R1684 ====== ====== R1684 ======
- 
-<note important>​**Achtung! R1 TRANSFER IN PROGRESS! MONITORING REQUIRED!**</​note>​ 
-R1 monitoring instructions:​ [[operations:​monitoring.ivs.etransfer|operations:​monitoring.ivs.etransfer]] 
- 
  
 **Hobart 12m:** **Hobart 12m:**
Line 12: Line 8:
  
 Data volume at beginning: 7.76TB Data volume at beginning: 7.76TB
 +
 +  * 17:03 UT - Experiment started OK (vk)
 +
 +BBC13 and BBC14 are frequently less than zero (jakob) (This is an overflow caused by an excess in Tsys - Chris)
  
  
Line 21: Line 21:
 Data volume at beginning: 0TB Data volume at beginning: 0TB
  
 +  * 17:00 UT - Experiment started OK (vk)
 +
 +  * 11:19 UT - Noticed all of X-band Tsys being $$$$$$! Approximately 120 soon after. RFI? (Chris)
  
 **Yarragadee 12m:** **Yarragadee 12m:**
Line 28: Line 31:
 Data volume at beginning: 0TB Data volume at beginning: 0TB
  
- +  * 17:00 UT - Experiment started OK (vk) 
- +  * 14:55 UT - booting the IPS didn't fix the Anemonitor (Ellen)
  
/home/www/auscope/opswiki/data/attic/handover/r1684.1429532978.txt.gz · Last modified: 2015/04/20 12:29 by liza