* Signs of RFI in channels S5, S6 (overflow) pretty much all the time (Liza) | * Signs of RFI in channels S5, S6 (overflow) pretty much all the time (Liza) | ||
* Racbus lost connection with newsmerd 2 times, the pcal control had to be returned to fs manually (calu...) Caused overflow of all VCs (Liza) | * Racbus lost connection with newsmerd 2 times, the pcal control had to be returned to fs manually (calu...) Caused overflow of all VCs (Liza) | ||
+ | * 11:45 He supply pressure ~278 psi. Dropping at this rate it should be below 275 psi in about an hour or two. Liza will contact Brett and he will make decision (Anita) | ||
**Katherine** | **Katherine** |