User Tools

Site Tools


handover:r1706

This wiki is not maintained! Do not use this when setting up AuScope experiments!

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
handover:r1706 [2015/09/21 17:03]
Ross Turner
handover:r1706 [2015/09/22 18:04] (current)
Ross Turner
Line 5: Line 5:
 Module: HOB+1004, start pos: 4819.273 GB Module: HOB+1004, start pos: 4819.273 GB
  
 +Windstowed 0436-052 (JMc)
 +
 +Major antenna failure after 1330 UT (Ross) ​
  
 **Katherine** **Katherine**
Line 10: Line 13:
 Module: HAY-0062, start pos: 159.511 GB Module: HAY-0062, start pos: 159.511 GB
  
 +Network interruption at ~0300 with associated clock break - likely a brief power glitch. pps_delay through dbbc showed slippage between 0300 and 0315 although no dot? errors. Reconfigured DBBc at 0315, schedule resumed at 0320. (JMc)
 +
 +Scans affected: 265-0258 to 265-0318
 +
 +2015.265.16:​12:​01 ALARM: Delay through DBBC has changed. Scans 265-1611a through 1615b affected (Ross).
 +
 +2015.265.16:​36:​03 ALARM: Delay through DBBC has changed. Scans 265-1635 through 1641a affected (Ross).
  
 **Yarragadee** **Yarragadee**
/home/www/auscope/opswiki/data/attic/handover/r1706.1442855035.txt.gz · Last modified: 2015/09/21 17:03 by Ross Turner