User Tools

Site Tools


handover:r1706

This wiki is not maintained! Do not use this when setting up AuScope experiments!

This is an old revision of the document!


R1706

Hobart 26m

Module: HOB+1004, start pos: 4819.273 GB

Windstowed 0436-052 (JMc)

Katherine

Module: HAY-0062, start pos: 159.511 GB

Network interruption at ~0300 with associated clock break - likely a brief power glitch. pps_delay through dbbc showed slippage between 0300 and 0315 although no dot? errors. Reconfigured DBBc at 0315, schedule resumed at 0320. (JMc)

Scans affected: 265-0258 to 265-0318

2015.265.16:12:01 ALARM: Delay through DBBC has changed. Scans 265-1611a through 1615b affected (Ross).

2015.265.16:36:03 ALARM: Delay through DBBC has changed. Scans 265-1635 through 1641a affected (Ross).

Yarragadee

Module: USN-0036, start pos: 140.456 GB

You could leave a comment if you were logged in.
/home/www/auscope/opswiki/data/attic/handover/r1706.1442940195.txt.gz · Last modified: 2015/09/22 16:43 by Ross Turner