This shows you the differences between two versions of the page.
Both sides previous revision Previous revision Next revision | Previous revision Next revision Both sides next revision | ||
handover:r1743 [2016/06/08 03:48] Tiege McCarthy |
handover:r1743 [2016/06/08 08:42] Jesse Swan |
||
---|---|---|---|
Line 9: | Line 9: | ||
* 2200UT - Getting some DBBC offset drifts (JS) | * 2200UT - Getting some DBBC offset drifts (JS) | ||
* 2205UT - Reset DBBC during gap, still missed scans 159-2210,159-2212a (JS) | * 2205UT - Reset DBBC during gap, still missed scans 159-2210,159-2212a (JS) | ||
- | * 0030UT - Heater switched off in maser room (Approximate time) (JR) | + | * 0030UT - Heater switched off in maser room (Approximate time given by Bret, may have been >0033UT) (JR) |
* 0033UT - ALARM: Delay through DBBC has changed. Will monitor and reset DBBC if problem persists. (JR) | * 0033UT - ALARM: Delay through DBBC has changed. Will monitor and reset DBBC if problem persists. (JR) | ||
+ | * 0825UT - ALARM: Delay through DBBC has changed. Monitoring for now (Tiege) | ||
+ | * 0836UT - Still drifting, Have halted the schedule and attempting to reset dbbc and fix the problem (Tiege) | ||
**Yarragadee 12m:** | **Yarragadee 12m:** | ||