Line 3: Line 3:
 **Katherine** **Katherine**
  
-Disk VSN: USN-0097+Disk VSN: USN-0067
  
 Data Volume at Beginning: 0GB Data Volume at Beginning: 0GB
Line 9: Line 9:
   * 1420 UT Starting setup of antenna: lots of errors for mk5, maser showing bad values - looks like there has been a power outage since the last experiment on site - checking to see if anything needs on-site personnel to fix. (Bryn)   * 1420 UT Starting setup of antenna: lots of errors for mk5, maser showing bad values - looks like there has been a power outage since the last experiment on site - checking to see if anything needs on-site personnel to fix. (Bryn)
   * 1445 UT Have everything working except for the field system time, have issued hwclock -w as superuser, but this hasn't fixed the issue with the wrong fs time. Cannot communicate with the gpib devices either. (Bryn)   * 1445 UT Have everything working except for the field system time, have issued hwclock -w as superuser, but this hasn't fixed the issue with the wrong fs time. Cannot communicate with the gpib devices either. (Bryn)
-  * 1450 UT rebooted ​fs computer. (Bryn)+  * 1450 UT rebooting ​fs computer ​because I can't get the time fixed. (Bryn
 +  * 1540 UT fs hasn't come up from reboot yet. (Bryn) 
 +  * 1650 UT Field system pc back up after reboot via IP. (Bryn) 
 +  * 1700 UT Can't get the fs time to work - both hwclock and date return the normal time, as does fmset - I have run out of ideas. The error in time means that the telescope does not go to the right source in the sky, so I've halted the schedule until it is fixed. (Bryn) 
 +  * 0000 UT Problems with maser server. GPIB comms not working, tried restarting hub etc contacting Brett and Mick on site (Warren) 
 +  * 0150 Schedule resumed without GPIB/clkoff readings (JMc) 
 +  * 0438 Schedule halted to investigate GPIB error. Problem appears to be the GPIB-RS232 converter, unable to be fixed today and all clkoff readings will need to be entered manually as comments. DBBC reconfigured after large pps_delay noted. (JMc) 
 +  * 0502 Schedule resumed with first good data. (JMc)
  
 **Yarragadee** **Yarragadee**
Line 18: Line 25:
  
   * Rebooted the Yarragadee webcam, it's working again. (Bryn)   * Rebooted the Yarragadee webcam, it's working again. (Bryn)
 +  * 1700 UT Experiment started OK
 +  * 2230 UT Disk offset seems to be drifting quickly, will let JMc know. (Bryn)
  