User Tools

Site Tools


handover:r1875

This wiki is not maintained! Do not use this when setting up AuScope experiments!

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
handover:r1875 [2019/01/02 22:18]
Warren Hankey
handover:r1875 [2019/01/03 05:40] (current)
Warren Hankey
Line 15: Line 15:
    * 22:03 halted schedule for another dbbc restart , missed scans 002-2203b to 002-2217a (warren)    * 22:03 halted schedule for another dbbc restart , missed scans 002-2203b to 002-2217a (warren)
    * 22:30 resumed schedule with 002-2222 (w)    * 22:30 resumed schedule with 002-2222 (w)
 +   * 23:02 halted schedule for dbbc 2 hr cool-down, missed scans 002-2304b to 003-0053a (w)
 +   * 00:55 resumed at scan 003-0055 (w)
 +   * 01:00 dbbc delay still drifting! (w)
 +   * 03:03 abandoning experiment dbbc faulty (w)
 +   * 03:55 yet another attempt to fix dbbc, to no avail, resumed at 003-0352 (w)
 +   * 05:32 recording anyway in case some sense can be made of data (w)
 +   * 05:38 fmset to set delay back to 0.29 us
  
 **Yarragadee 12m** **Yarragadee 12m**
/home/www/auscope/opswiki/data/attic/handover/r1875.1546467520.txt.gz · Last modified: 2019/01/02 22:18 by Warren Hankey