This shows you the differences between two versions of the page.
Both sides previous revision Previous revision | Last revision Both sides next revision | ||
handover:r1982 [2021/01/19 09:59] Lim Chin Chuan |
handover:r1982 [2021/01/19 11:13] Lim Chin Chuan |
||
---|---|---|---|
Line 23: | Line 23: | ||
* 1100 UT estimated time to change to 16 TB module (w) | * 1100 UT estimated time to change to 16 TB module (w) | ||
* 0946 UT error: mark5 probably not running. Halted schedule.The connection to mk5yg failed, rebooted from ipsyg and resynced. Resumed schedule at 0955UT. Missed-scans 019-0945b until 019-0950 (Lim). | * 0946 UT error: mark5 probably not running. Halted schedule.The connection to mk5yg failed, rebooted from ipsyg and resynced. Resumed schedule at 0955UT. Missed-scans 019-0945b until 019-0950 (Lim). | ||
+ | * 1111UT swapped to HOB+0104 in between scans. No missed scan (Lim). | ||