User Tools

Site Tools


handover:r4689

This wiki is not maintained! Do not use this when setting up AuScope experiments!

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
handover:r4689 [2015/05/29 22:46]
Vasaant Krishnan
handover:r4689 [2015/05/29 22:50] (current)
Vasaant Krishnan
Line 3: Line 3:
 <note important>​**Achtung! R1 TRANSFER IN PROGRESS! MONITORING REQUIRED!**</​note>​ <note important>​**Achtung! R1 TRANSFER IN PROGRESS! MONITORING REQUIRED!**</​note>​
 R1 monitoring instructions:​ [[operations:​monitoring.ivs.etransfer|operations:​monitoring.ivs.etransfer]] R1 monitoring instructions:​ [[operations:​monitoring.ivs.etransfer|operations:​monitoring.ivs.etransfer]]
 +
 +
 +R1 Transfer behaved the entire time and looks like it finished happy. (Ellen)
 +
  
  
/home/www/auscope/opswiki/data/attic/handover/r4689.1432939562.txt.gz · Last modified: 2015/05/29 22:46 by Vasaant Krishnan