User Tools

Site Tools


handover:r4690

This wiki is not maintained! Do not use this when setting up AuScope experiments!

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Next revision
Previous revision
handover:r4690 [2015/06/04 07:04]
Lucia McCallum
handover:r4690 [2015/06/05 03:41] (current)
Jim Lovell
Line 3: Line 3:
 **Hobart** **Hobart**
  
-Module: BKG+0136, ​xx GB+Module: BKG+0136, ​1.0 GB
  
  
 **Katherine** **Katherine**
  
-Module: NAIC-004, ​xx GB+Module: NAIC-004, ​1.0 GB 
 + 
 +  * Maser AHM power ~/= on 23.8 (blue number). ** Should call Brett during the day** (Lucia) 
 +  * 02:31:06 UT PPS Delay through DBBC changed. ​ This may cause a small break in the clock offset ​ (Imogen)
  
 **Yarragadee** **Yarragadee**
  
-Module: USN-0087, ​xx GB+Module: USN-0087, ​1.0 GB 
 + 
 +  * ifc is on 63 attenuation but the power levels look good (Lucia) 
 +  * 02:55:16UT ifc has righted itself to about 20 attenuation (Imogen)
  
 {{tag>}} {{tag>}}
Line 18: Line 24:
  
 ~~DISCUSSION~~ ~~DISCUSSION~~
- 
/home/www/auscope/opswiki/data/attic/handover/r4690.1433401473.txt.gz · Last modified: 2015/06/04 07:04 by Lucia McCallum