This shows you the differences between two versions of the page.
Both sides previous revision Previous revision Next revision | Previous revision | ||
handover:r4748 [2016/07/14 18:59] Ellen Manning |
handover:r4748 [2016/07/14 22:13] (current) Ellen Manning |
||
---|---|---|---|
Line 2: | Line 2: | ||
**Katherine** | **Katherine** | ||
- | VSN: ..... start position: 0 GB | + | VSN: USN-1042/2000/2432 start position: 0 GB |
*experiment started late at line #58, source 0332-403 (Liz) | *experiment started late at line #58, source 0332-403 (Liz) | ||
*eremote control still not working as per AUG026 (Liz) | *eremote control still not working as per AUG026 (Liz) | ||
+ | *UT20:19:41 and 21:14:28 onsource slewing errors with associated error message:"an -103 pointing computer tracking errors are too large" (Liz) | ||
**Yarragadee** | **Yarragadee** | ||
- | VSN: ..... start position: 0 GB | + | VSN: MED-1011/4000/1024 start position: 0 GB |
*experiment started late at line #92, source CTA26 (Liz) | *experiment started late at line #92, source CTA26 (Liz) | ||
- | *eremote control froze and upon restart now doing the same as Ke. Now using field system VNC here too (Liz) | + | *eremote control froze during experiment start-up. Restarted but now doing the same as Ke so now using field system VNC here too (Liz) |
Line 18: | Line 18: | ||
~~DISCUSSION~~ | ~~DISCUSSION~~ | ||
- |