User Tools

Site Tools


handover:rd1505

This wiki is not maintained! Do not use this when setting up AuScope experiments!

This is an old revision of the document!


RD1505

Hobart 26m

Module VSN: USN-0072/6000

Pointer at the beginning: 1090 GB

  • UT 1735 Experiment started OK (JS)
  • UT 1818 Fiddling with IFD03 and IFD02 powerlevels during scans 188-1800a-188-1814. Levels are now between 0.1 and 1.0 when on source for both modes (JS)
  • UT 2115 PSUP he supply pressure has dropped below 275. Currently at 274 psi and looks to be still dropping (JS)
  • UT 2326 - Formatter re-synchronised after mark4 rack reset. Still trying to get vc7 working. (JMc)
  • UT 2334 - Swapped vc14 for vc7. vc7 now working but vc14 unlocked. Already heavily RFI affected, so likely no worse off. (JMc).
You could leave a comment if you were logged in.
/home/www/auscope/opswiki/data/attic/handover/rd1505.1436312193.txt.gz · Last modified: 2015/07/07 23:36 by Jesse Swan