This shows you the differences between two versions of the page.
Both sides previous revision Previous revision Next revision | Previous revision | ||
handover:rd1509 [2015/11/25 23:30] Ross Turner |
handover:rd1509 [2015/11/26 00:42] (current) Ross Turner |
||
---|---|---|---|
Line 9: | Line 9: | ||
* Wind stowed for large part of experiment (Ross) | * Wind stowed for large part of experiment (Ross) | ||
- | * 23:20 UT --- Power outage. | + | * 23:20 UT --- Power outage (Dave) |
+ | * 00:20 UT --- Recovered station from outage and returned to schedule. However, antenna is still wind-stowed. (Dave) | ||
+ | * After power was restored, Jim noticed the receiver was in the wrong position. Data before this point may be useless. | ||
+ | * Weather not available after power outage. | ||
{{tag>}} | {{tag>}} | ||
Line 16: | Line 18: | ||
~~DISCUSSION~~ | ~~DISCUSSION~~ | ||
- |