User Tools

Site Tools


handover:t2127

This wiki is not maintained! Do not use this when setting up AuScope experiments!

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Next revision
Previous revision
handover:t2127 [2018/09/04 22:44]
Pradyumna Kiran Kummamuru
handover:t2127 [2018/09/05 18:06] (current)
Pradyumna Kiran Kummamuru
Line 1: Line 1:
 ====== T2127 ====== ====== T2127 ======
 +
 +NOTE: Schedule appears to have very long slews and dwells, so make timeout very long (25-30mins) to avoid spurious alarms about no FS activity. ​
  
 ** Katherine 12m **  ** Katherine 12m ** 
Line 6: Line 8:
 VSN: HAY-0028/​960 VSN: HAY-0028/​960
     * Experiment started okay (Lucas).     * Experiment started okay (Lucas).
 +    * 23:25 UT and we have a lovely early one. DBBC began drifting. Halted schedule and reconfigured. Partially missed scan 247-2326 (Lucas).
 +    * 05:30 Schedule halted to reconfigure DBBC after delay jump. (JMc)
 +    * 06:00 Schedule halted to reconfigure DBBC after delay jump. (Lucas)
 +    * 09:25:01 Schedule halted to reconfigure DBBC after delay jump. Possibly could have corrupted the 248-0924 scan and may have missed the 248-0951a (Prad).
 +
  
 ** Yarragadee 12m ** ** Yarragadee 12m **
Line 12: Line 19:
 VSN: BKG-0026/​1480 VSN: BKG-0026/​1480
     * Experiment started okay (Lucas).     * Experiment started okay (Lucas).
 +    * 16:42 UT Problem with internet connection (unable to connect to VNC server). Had called Yarragadee on call person to stow the dish and reset the internet connection (mas)
  
 {{tag>}} {{tag>}}
/home/www/auscope/opswiki/data/attic/handover/t2127.1536101097.txt.gz · Last modified: 2018/09/04 22:44 by Pradyumna Kiran Kummamuru