User Tools

Site Tools


handover:veps06

This wiki is not maintained! Do not use this when setting up AuScope experiments!

VEPS06

Hobart 26m:

Recording through MkIV rack and DBBC simultaneously.

For MkIV rack, pcfs running on VNC session newsmerd:1 as usual. DBBC running through field system on pcfsho:1.

eRemoteCtrl and log monitor for MarkIV only

Disk VSN: MarkIV recording to HOB+0074 (Mark5A), DBBC recording to HOB+0072 (Mark5B+)

Data volume at beginning: 0

-Jim

  • 14:45 UT - MarkIV disk pos 46 GB behind, while DBBC is 30 GB behind. (Ellen)
  • 16:55 UT - MarkIV disk pos 45 GB behind, while DBBC is 36 GB behind. (Ellen)
  • 19:04 UT - MarkIV disk pos 53 GB behind, while DBBC is 43 GB behind. (Ellen)
  • 21:55 UT - MarkIV disk pos 64 GB behind, while DBBC is 51 GB behind. (Ellen)
You could leave a comment if you were logged in.
/home/www/auscope/opswiki/data/pages/handover/veps06.txt · Last modified: 2015/08/19 21:56 by Ellen Manning