This shows you the differences between two versions of the page.
Both sides previous revision Previous revision Next revision | Previous revision Last revision Both sides next revision | ||
operation:technical [2018/01/12 05:48] Warren Hankey |
operation:technical [2018/01/15 22:53] Warren Hankey |
||
---|---|---|---|
Line 23: | Line 23: | ||
http://webcamyg.phys.utas.edu.au | http://webcamyg.phys.utas.edu.au | ||
- | ===Cryo=== | + | ===Cryo System=== |
- | Warmed and pressure drop | + | Action plan after warmed and severe pressure drop. Compressor has cut out as pressure went below 150 psi |
- commence vaccuming S/X using turbo pump | - commence vaccuming S/X using turbo pump | ||
Line 41: | Line 41: | ||
compressor and increase the pressure to 300 psi supply. | compressor and increase the pressure to 300 psi supply. | ||
- | - locate the leak | + | - locate the leak. Leak detector goes yellow for heavy molecules, red for light gas. Keep skin away from tip, and don't breathe near tip. |
- power down the compressor | - power down the compressor | ||
Line 47: | Line 47: | ||
- replace leaking hose | - replace leaking hose | ||
- | - power up the compressor | + | - power up the compressor, must have > 150 psi to start |
- | -top helium up to 300 psi | + | -top helium up to 300 psi once compressor running |
- commence s/x cooling by turning on cryo S/X power in diesel room | - commence s/x cooling by turning on cryo S/X power in diesel room |