Line 16: | Line 16: | ||
- Module at Hobart full or broken, but second module had key switched off | - Module at Hobart full or broken, but second module had key switched off | ||
- DBBC at Ke been playing up quite a few times over the last fortnight. | - DBBC at Ke been playing up quite a few times over the last fortnight. | ||
+ | - Tsys at Yg not working, new hardware on the way to hopefully fix. | ||
+ | - Ke cross over switch default setting. Needs attention. | ||
+ | |||
+ | - Did you know: new clean page. | ||
+ | - Experiment name changed (e.g.) AUA003 instead of 002, make sure cal and master schedule are the same. | ||
+ | - Ross-ter to clean kitchen. | ||
**Handover notes issues:** | **Handover notes issues:** | ||
- A few problems with *R1780*: | - A few problems with *R1780*: | ||
- Hb e-remote control didn't work and neither did Dave's backup? Was this resolved and so what was the fix? | - Hb e-remote control didn't work and neither did Dave's backup? Was this resolved and so what was the fix? | ||
- | - Ke DBBC problem? Is that resolved? | + | - Ke DBBC problem? Is that resolved? PCI7200 BOARD. Replaced. |
- | - Patrick could you put the problem/fix you had with Ke IF power levels? Also the pointing problem and fix? | + | - Patrick could you put the problem/fix you had with Ke IF power levels? Also the pointing problem and fix? Ped lost power and tripped E-stop. Needed manual reboot. |
- Bryn/Tiege, there were MK5 and clock problems at Yarragadee? The fix as per the handover notes seems vague. | - Bryn/Tiege, there were MK5 and clock problems at Yarragadee? The fix as per the handover notes seems vague. | ||
- *R1782*: | - *R1782*: | ||
- Ross I had the same problem with multiple dim's running. After I logged in as root (su) and tried that seemed to kill them. | - Ross I had the same problem with multiple dim's running. After I logged in as root (su) and tried that seemed to kill them. | ||
- | - Could you please describe how you noticed/diagnosed that the Mark5 disk/Mark5 was faulty at Hb? 'acs problem seems to be related to testing other module.'? | + | - Could you please describe how you noticed/diagnosed that the Mark5 disk/Mark5 was faulty at Hb? 'acs problem seems to be related to testing other module.'? Didn't allow recording. Checkmk5 gave an error, scan_check 4/8th line gave a fault message. Swapped to other bank and back then it died. Module marked as bad. |
- *R4781*: | - *R4781*: | ||
- | - "IF unit has a fault, probably with the PIC. No noise diode control at the moment, so no Tsys. Power levels into DBBC are OK though. (Jim)'" This was fixed already unless I am mistaken? | + | - "IF unit has a fault, probably with the PIC. No noise diode control at the moment, so no Tsys. Power levels into DBBC are OK though. (Jim)'" This was fixed already unless I am mistaken? IF unit works apart from noise diode control, can't measure tsys. New pic on the way. |
- *R4782*: | - *R4782*: | ||
- Secondary module not correctly inserted into mk5 (I think the key was not turned). When first module became full the the mk5 gave "ERROR m5 -900 : Can't XLRappend() recording" (which is not an alarm) until noticed at 17:00UT. I changed M5 -900 to ALARM in the alarm_actions.txt for Hb. | - Secondary module not correctly inserted into mk5 (I think the key was not turned). When first module became full the the mk5 gave "ERROR m5 -900 : Can't XLRappend() recording" (which is not an alarm) until noticed at 17:00UT. I changed M5 -900 to ALARM in the alarm_actions.txt for Hb. | ||
- | - If people aren't using Arwins comments.py script, they should be. | + | - |
+ | - If people aren't using Arwins comments.py script, they should be. | ||
+ | - Report problems. | ||