User Tools

Site Tools


operations:agenda2017_07_20

This wiki is not maintained! Do not use this when setting up AuScope experiments!

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
operations:agenda2017_07_20 [2017/07/20 03:11]
Bryn Emptage
operations:agenda2017_07_20 [2017/07/20 03:20] (current)
Jonathan Rogers
Line 3: Line 3:
 Chair: Bryn Chair: Bryn
  
-Present: Mas, Lucas, Ross, Patrick, Tiege, Jamie+Present: Mas, Lucas, Ross, Patrick, Tiege, Jamie, Jesse
  
-Apologies: Liz, Arwin, Lucia+Apologies: Liz, Arwin, Lucia, Jonny
  
-Absent: ​Jesse+Absent:
  
 General Issues: General Issues:
Line 17: Line 17:
  
   * 26 meter being used for some geometry and austral experiments.   * 26 meter being used for some geometry and austral experiments.
 +
 +  * hb getting new dbbc - potentially more fiddly, will be operational in a few months'​ time.
  
 Handover Issues: Handover Issues:
    
   * Issues with Ho for aua023 - mark5 issues caused by bad prc file?   * Issues with Ho for aua023 - mark5 issues caused by bad prc file?
-   * Schedules have an incorrect setting for the mk4 rack/mk5. Can improve files from the scheduler - Moving away from using the mk4 rack. +    ​* Schedules have an incorrect setting for the mk4 rack/mk5. Can improve files from the scheduler - Moving away from using the mk4 rack. 
-   ​* r1802 will be running on both mk5 and mk4 rack at same time to test moving over from the mk4 rack. No more angry red lights. If this works, we will be decommissioning the mk4 rack.+    * r1802 will be running on both mk5 and mk4 rack at same time to test moving over from the mk4 rack. No more angry red lights. If this works, we will be decommissioning the mk4 rack.
  
  
  
/home/www/auscope/opswiki/data/attic/operations/agenda2017_07_20.1500520280.txt.gz · Last modified: 2017/07/20 03:11 by Bryn Emptage