User Tools

Site Tools


operations:agenda2017_10_12

This wiki is not maintained! Do not use this when setting up AuScope experiments!

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Next revision
Previous revision
Last revision Both sides next revision
operations:agenda2017_10_12 [2017/10/11 14:48]
Tiege McCarthy created
operations:agenda2017_10_12 [2017/10/12 01:50]
Jim Lovell
Line 5: Line 5:
 Present: Tiege, ​ Present: Tiege, ​
  
-Apologies: Bryn+Apologies: Bryn, Jonny
  
 Absent: ​ Absent: ​
  
 General Issues: General Issues:
-  - +  - How is everyone going with Hobart 26m shifts currently, are people confused as to what back-ends should be being used or is that information getting conveyed properly? 
 +  - Isn't LBA 2017OCT session soon? 
 +  - Cont17 roster - Nov 28 - Dec 12. 
 Handover Issues: Handover Issues:
-  ​1. Vacuum pressure leak for receiver cooling system+  ​- Ho: Vacuum pressure leak for receiver cooling system ​(AUA029) 
 +  - Ke: Mick changed disk in middle of recording, was the mystery disk that was originally being recorded to every identified? (R4811) 
 +  - Yg: Pointing offsets/​tracking errors, Note from Arwin in handover notes: "​During setup, noticed yg had large offsets in the antenna checks, had to the the pointing checks again and the offsets were better the second time around. This has happened a few times, should this be raised at the meeting?"​
  
  
  
/home/www/auscope/opswiki/data/pages/operations/agenda2017_10_12.txt · Last modified: 2017/10/12 02:25 by Tiege McCarthy