General Issues: | General Issues: | ||
- | - Calendar didn't include Hobart even though it was on the master schedule. The 26m was a late addition to the AUA schedule. | + | - Calendar didn't include Hobart even though it was on the master schedule. The 26m was a late addition to the AUA schedule. Should be avoided in future. |
+ | - Let Jamie know if you don't have access rights to the calendar. | ||
- nobs looks at master schedule. Warren's script already checks master schedule. | - nobs looks at master schedule. Warren's script already checks master schedule. | ||
+ | - CHECK THE MASTER SCHEDULE! and the start time. | ||
+ | - Jesse sent around an email about script. Works for ho, hb, ke and yg, and opens most of the windows needed. | ||
+ | - didn't put delay plots in the right position; this is because they were already open. | ||
+ | - run windex before windows if there is stuff open. | ||
Handover Issues: | Handover Issues: |