This wiki is not maintained! Do not use this when setting up AuScope experiments!
This is an old revision of the document!
Chair: Patrick
Attended:
Apologies: Arwin, Ross, Lucas
Absent:
Handover Issues
CRF106:
Assigned module (HOB+0107) was full, but used HOB+0097 instead
Internet connection problem occurred, caused experiment to start late (?)
R1836:
mark5 time 0.2 second off from fs time and computer time, but delays were stable. Experiment already started, didn't want to introduce a clock jump so just left it. Seemed to fix itself later.
General Issues
Ke interior light fixed. Can turn on at pdu1ke.phys.utas.edu.au.
Hobart26m drives major failure.
/home/www/auscope/opswiki/data/attic/operations/agenda2018_04_05.1522896775.txt.gz · Last modified: 2018/04/05 02:52 by Patrick Yates