User Tools

Site Tools


operations:agenda2020_03_12

This wiki is not maintained! Do not use this when setting up AuScope experiments!

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Next revision
Previous revision
operations:agenda2020_03_12 [2020/03/12 00:15]
Noor Md Said created
operations:agenda2020_03_12 [2020/03/12 02:19] (current)
Noor Md Said
Line 3: Line 3:
 Next week's chair: Tiege Next week's chair: Tiege
  
-Attended: ​+Attended: ​Lim, Katie, Simin, Elouise, Prad, Jamie, Becca, Tiege, Earl
  
-Apologies:+Apologies: ​Patrick, Lucas, Jay
  
 Absent: ​ Absent: ​
Line 11: Line 11:
 General Issues General Issues
  
-LBA shifts will start next week+LBA shifts will start next week 
 +- If uni totally close due to coronavirus (no access to the building), need to do remote observation. Make sure internet access and VPN are working. ​
  
  
 Handover Issues Handover Issues
  
-Katherine and Hobart 12m (AUA062)+Katherine and Hobart 12m (AUA062):
  
 BBC power readings are sometimes bad. DBBC3 Sampler 4 was bad for a few readings, then went back to OK  BBC power readings are sometimes bad. DBBC3 Sampler 4 was bad for a few readings, then went back to OK 
 +- problem with readout from a summary file DBBC, calibration of DBBC seems to be off. Receiver a bit warm. For the time being, nothing to be done. Just keep an error of sampler to a minimum, if the error is increasing, need to inform Jamie
  
  
  
  
/home/www/auscope/opswiki/data/attic/operations/agenda2020_03_12.1583972123.txt.gz · Last modified: 2020/03/12 00:15 by Noor Md Said