User Tools

Site Tools


operations:agenda2020_12_03

This wiki is not maintained! Do not use this when setting up AuScope experiments!

This is an old revision of the document!


Chair: Lim

Next meeting chair: Simin

Attended:

Apologies:

General Issues

  • Ho26 S/X receiver sensitivity issue solved after LNA Power supply repair?

Handover Issues

  • r1974
    • Ho26: maserhb seems to be down (Simin)
  • crd109
    • Ho26: errors“ Delay trough DBBC has changed. Monitor for stability and reset DBBC if it drifts” (Mas)
/home/www/auscope/opswiki/data/attic/operations/agenda2020_12_03.1606956408.txt.gz · Last modified: 2020/12/03 00:46 by Lim Chin Chuan