User Tools

Site Tools


operations:agenda2020_12_03

This wiki is not maintained! Do not use this when setting up AuScope experiments!

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Next revision
Previous revision
operations:agenda2020_12_03 [2020/12/03 00:46]
Lim Chin Chuan created
operations:agenda2020_12_03 [2020/12/03 09:22] (current)
Lim Chin Chuan
Line 3: Line 3:
 **Next meeting chair:** Simin **Next meeting chair:** Simin
  
-**Attended:​**+**Attended:​** ​Mas, Katie, Guifre, Jamie, Earl, Prad, Jay
  
-**Apologies:​**  ​+**Apologies:​**  ​Simin, Eloise, Patrick
  
  
 **General Issues** **General Issues**
  
-  * Ho26 S/X receiver sensitivity issue solved after LNA Power supply repair?+  * Ho26 S/X receiver sensitivity issue solved after LNA Power supply repair. Nominal temperature reading again. Cryo issue now. 
 +  * Note: Brett on leave, Warren on its own now at Mt Pleasant.
  
 **Handover Issues** **Handover Issues**
Line 16: Line 17:
   * r1974   * r1974
     * Ho26: maserhb seems to be down (Simin)     * Ho26: maserhb seems to be down (Simin)
 +    * Computer runs the software has failed. (windows 7 image, can clone the drive, somehow.. Cannot monitoring the maser yet at the moment)
   * crd109   * crd109
     * Ho26: errors“ Delay trough DBBC has changed. Monitor for stability and reset DBBC if it drifts” (Mas)     * Ho26: errors“ Delay trough DBBC has changed. Monitor for stability and reset DBBC if it drifts” (Mas)
 +    * Lost sync through dbbc, power cycle seems to have solved it. PRC file wasn't calling the monitoring command, seems to be commented out. pps_delay slips while the fmset looks correct, not sure what issue there is.
  
       ​       ​
/home/www/auscope/opswiki/data/attic/operations/agenda2020_12_03.1606956408.txt.gz · Last modified: 2020/12/03 00:46 by Lim Chin Chuan