This shows you the differences between two versions of the page.
Next revision | Previous revision | ||
operations:agenda2020_12_03 [2020/12/03 00:46] Lim Chin Chuan created |
operations:agenda2020_12_03 [2020/12/03 09:22] (current) Lim Chin Chuan |
||
---|---|---|---|
Line 3: | Line 3: | ||
**Next meeting chair:** Simin | **Next meeting chair:** Simin | ||
- | **Attended:** | + | **Attended:** Mas, Katie, Guifre, Jamie, Earl, Prad, Jay |
- | **Apologies:** | + | **Apologies:** Simin, Eloise, Patrick |
**General Issues** | **General Issues** | ||
- | * Ho26 S/X receiver sensitivity issue solved after LNA Power supply repair? | + | * Ho26 S/X receiver sensitivity issue solved after LNA Power supply repair. Nominal temperature reading again. Cryo issue now. |
+ | * Note: Brett on leave, Warren on its own now at Mt Pleasant. | ||
**Handover Issues** | **Handover Issues** | ||
Line 16: | Line 17: | ||
* r1974 | * r1974 | ||
* Ho26: maserhb seems to be down (Simin) | * Ho26: maserhb seems to be down (Simin) | ||
+ | * Computer runs the software has failed. (windows 7 image, can clone the drive, somehow.. Cannot monitoring the maser yet at the moment) | ||
* crd109 | * crd109 | ||
* Ho26: errors“ Delay trough DBBC has changed. Monitor for stability and reset DBBC if it drifts” (Mas) | * Ho26: errors“ Delay trough DBBC has changed. Monitor for stability and reset DBBC if it drifts” (Mas) | ||
+ | * Lost sync through dbbc, power cycle seems to have solved it. PRC file wasn't calling the monitoring command, seems to be commented out. pps_delay slips while the fmset looks correct, not sure what issue there is. | ||
| |