This shows you the differences between two versions of the page.
Next revision Both sides next revision | |||
operations:agenda2021_01_28 [2021/01/28 01:44] Patrick Yates created |
operations:agenda2021_01_28 [2021/01/28 01:47] Patrick Yates |
||
---|---|---|---|
Line 10: | Line 10: | ||
**General Issues** | **General Issues** | ||
- | * Katherine will back next week. | + | * Katherine: only dbbc3? |
**Handover Issues** | **Handover Issues** | ||
- | * R1981 | + | * **Ho** |
- | * Ho26m: Error when setting up: SX receiver parameter pres out of range. This indicates that the pressure was too high (~6, should be less that 5. Not a big deal). Alarm ignored as there is nothing we can do about it. (Eloise & Warren) | + | * r1982 |
- | + | * multiple ''ERROR sc -13 setcl: formatter to FS time difference 0.5 seconds or greater'' errors | |
- | * T2P144 | + | |
- | * Ho26m: Drives shut down while slewing (Warren) | + | |
- | * Experiment started 5 minutes (1735 UT) late due to ops8 schedules script not writing snp file in hobart:/usr2/sched/ (mas/warren) | + | |
- | + | ||
| |