User Tools

Site Tools


operations:documentation.ivs.finishing_v2

This wiki is not maintained! Do not use this when setting up AuScope experiments!

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Next revision
Previous revision
operations:documentation.ivs.finishing_v2 [2012/09/04 06:08]
Jim Lovell created
operations:documentation.ivs.finishing_v2 [2019/02/09 00:41] (current)
Lucas Hyland
Line 2: Line 2:
 At the end of an observation,​ the antenna should return to stow and eRemoteControl will bring up a checklist to run through. Here are some notes on the checklist: At the end of an observation,​ the antenna should return to stow and eRemoteControl will bring up a checklist to run through. Here are some notes on the checklist:
  
 +  * [[operations:​documentation.eRemoteControl_checklist_end|Description of end experiment checklist parameters]]
  
 +If it was an IVS experiment, process logs, comment on the experiment and and send the end of experiment e-mail:
  
 +  * [[operations:​documentation.ivs.commentsfile|Logs and end-of-experiment message instructions]]
  
-After it has, exit from the Field Systemby typing the following command in the eRemoteControl operator input window:+Unless there is another experiment to follow shortly, exit from the Field System by typing the following command in the eRemoteControl operator input window ​**NOTE: Do not do this for ''​hobart''​ the 26m PCFS!**:
 <​code>​terminate</​code>​ <​code>​terminate</​code>​
  
 Exit the log monitor program. Exit the log monitor program.
  
-If Yarragadee is observing, email the operator to let him know the observation is finished and the telescope has gone to stow at moblas@midwest.com.au +If Yarragadee is observing ​(and is not following on), email the operator to let him know the observation is finished and the telescope has gone to stow at auscope-yg@list.utas.edu.au  
 + 
 +<note important>​Note:​ it is no longer necessary to reboot PCFS computers at the end of experiments. Do not turn off ops8 either! </​note>​
  
 Please power-down the stairwell monitors using the switches under the main desk labelled Screen 1, Screen 2, ... when finishing an experiment or after hours to save power. Please power-down the stairwell monitors using the switches under the main desk labelled Screen 1, Screen 2, ... when finishing an experiment or after hours to save power.
  
-If another experiment follows this one, go to the next step: [[operations:​documentation.ivs.newstart_v2|following ​on with another ​observation]].+If another experiment follows this one, go to the next step: [[operations:​documentation.ivs.newstart_v3_fs9.10.5|Following ​on with another ​experiment]]
/home/www/auscope/opswiki/data/attic/operations/documentation.ivs.finishing_v2.1346738882.txt.gz · Last modified: 2012/09/04 06:08 by Jim Lovell