User Tools

Site Tools


operations:documentation.ivs.finishing_v2

This wiki is not maintained! Do not use this when setting up AuScope experiments!

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
operations:documentation.ivs.finishing_v2 [2014/10/22 02:49]
Jamie McCallum
operations:documentation.ivs.finishing_v2 [2019/02/09 00:41] (current)
Lucas Hyland
Line 8: Line 8:
   * [[operations:​documentation.ivs.commentsfile|Logs and end-of-experiment message instructions]]   * [[operations:​documentation.ivs.commentsfile|Logs and end-of-experiment message instructions]]
  
-Unless there is another experiment to follow shortly, exit from the Field System by typing the following command in the eRemoteControl operator input window:+Unless there is another experiment to follow shortly, exit from the Field System by typing the following command in the eRemoteControl operator input window ​**NOTE: Do not do this for ''​hobart''​ the 26m PCFS!**:
 <​code>​terminate</​code>​ <​code>​terminate</​code>​
  
 Exit the log monitor program. Exit the log monitor program.
  
-If Yarragadee is observing (and is not following on), email the operator to let him know the observation is finished and the telescope has gone to stow at auscope-yg@postoffice.utas.edu.au ​ +If Yarragadee is observing (and is not following on), email the operator to let him know the observation is finished and the telescope has gone to stow at auscope-yg@list.utas.edu.au ​
- +
-If this is the last experiment of the week and there is a gap of a day or more until the next experiment, please reboot the PCFS computer and the DBBC. To do this for the PCFS: +
-  * open a terminal on pcfs[ho|ke|yg] as ''​oper''​ +
-  * type ''​su''​ +
-  * (type in the root password) +
-  * type ''​reboot''​ +
- +
-It will take a couple of minutes to reboot. You'll need to manually start the VNC server next: +
-  * open a terminal on pcfs[ho|ke|yg] as ''​oper''​ +
-  * type ''​vncserver''​ +
-  * log out with an ''​exit''​ +
- +
-For the DBBC, first shut down the PC set using the "Start Menu" and then power cycle the entire unit using the Internet Power switch. To do this: +
-  * open a terminal on ops2 +
-  * type ''​telnet ipshb''​ +
-  * (type in the root password) +
-  * type ''/​Boot 5''​ (replace 5 with the number correponding to the DBBC) +
-  * type ''/​X''​ to exit. +
- +
  
 +<note important>​Note:​ it is no longer necessary to reboot PCFS computers at the end of experiments. Do not turn off ops8 either! </​note>​
  
 Please power-down the stairwell monitors using the switches under the main desk labelled Screen 1, Screen 2, ... when finishing an experiment or after hours to save power. Please power-down the stairwell monitors using the switches under the main desk labelled Screen 1, Screen 2, ... when finishing an experiment or after hours to save power.
  
 If another experiment follows this one, go to the next step: [[operations:​documentation.ivs.newstart_v3_fs9.10.5|Following on with another experiment]] If another experiment follows this one, go to the next step: [[operations:​documentation.ivs.newstart_v3_fs9.10.5|Following on with another experiment]]
/home/www/auscope/opswiki/data/attic/operations/documentation.ivs.finishing_v2.1413946176.txt.gz · Last modified: 2014/10/22 02:49 by Jamie McCallum