User Tools

Site Tools


operations:documentation.ivs.mark5_module_selection

This wiki is not maintained! Do not use this when setting up AuScope experiments!

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
Last revision Both sides next revision
operations:documentation.ivs.mark5_module_selection [2017/04/20 03:40]
Warren Hankey
operations:documentation.ivs.mark5_module_selection [2019/01/25 00:23]
Warren Hankey
Line 1: Line 1:
 ====== Choosing the right module for the experiment ====== ====== Choosing the right module for the experiment ======
  
-A module should be allocated by observatory staff, see the [[operations:log| Module ​Allocation spreadsheet]].+A module should be allocated by observatory staff, see the [[http://​131.217.63.180:​8000Experiment and Module ​Library]].
  
 As a rule R1 and R4 on a module by themselves (only at Hobart may R1 R4 go on a module together) and not mixed with other experiment types. If possible, please try to record an entire experiment onto a single module, most especially R4, CRDS, CRF, and R1 experiments. ​ If it won't fit, please contact observatory staff - they will usually be able to put a module with enough space into the Mark 5.  As a rule R1 and R4 on a module by themselves (only at Hobart may R1 R4 go on a module together) and not mixed with other experiment types. If possible, please try to record an entire experiment onto a single module, most especially R4, CRDS, CRF, and R1 experiments. ​ If it won't fit, please contact observatory staff - they will usually be able to put a module with enough space into the Mark 5. 
  
-If not instructed by the spreadsheet, ​check to see how much data will be recorded; then see which modules are mounted in the Mark5; choose one that is big enough as follows.+If not indicated on the spreadsheet, ​you need to fit the experiment on available modules. Check to see how much data will be recorded; then see which modules are mounted in the Mark5.
  
 ===== Data requirement ===== ===== Data requirement =====
/home/www/auscope/opswiki/data/pages/operations/documentation.ivs.mark5_module_selection.txt · Last modified: 2019/01/25 00:24 by Warren Hankey