User Tools

Site Tools


operations:documentation_austral15day_module_swaps

This wiki is not maintained! Do not use this when setting up AuScope experiments!

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
operations:documentation_austral15day_module_swaps [2013/12/05 03:08]
Jim Lovell
operations:documentation_austral15day_module_swaps [2013/12/09 05:47] (current)
Jim Lovell
Line 11: Line 11:
 | 4 Dec 17.30 - 18.30 | Ke : remove Bank B Module 3, insert Module 4 (16 TB) in Bank A | Thu 5 Dec 03.00 - 04.00 | | 4 Dec 17.30 - 18.30 | Ke : remove Bank B Module 3, insert Module 4 (16 TB) in Bank A | Thu 5 Dec 03.00 - 04.00 |
 | 4 Dec 23.00         | Hb : remove Bank A Module 3, insert Module 5 (16 TB). Module 3 for eTransfer | | Thu Dec 5, 10 AM | | 4 Dec 23.00         | Hb : remove Bank A Module 3, insert Module 5 (16 TB). Module 3 for eTransfer | | Thu Dec 5, 10 AM |
-| | | | | 
 | 4 Dec 18.36.24 - 6 Dec 18.23.32 | Recording to Module 4. Hb: 16 TB Bank B; Ke: 16 TB, Bank A; Yg: 16 TB Bank B | | 4 Dec 18.36.24 - 6 Dec 18.23.32 | Recording to Module 4. Hb: 16 TB Bank B; Ke: 16 TB, Bank A; Yg: 16 TB Bank B |
 | 6 Dec 18.24 - 18.28 | Yg : remove Bank B module, insert Module 6 (16 TB) | | 6 Dec 18.24 - 18.28 | Yg : remove Bank B module, insert Module 6 (16 TB) |
-| 6 Dec 18.30 - 19.30 | Ke : remove Bank A module, insert Module 6 (16 TB) | Sat Dec 7, 04.00 - 05.00 | +From 6 Dec 18.30 - 8 Dec 18.00 19.30 | Ke : remove Bank A module, insert Module 6 (16 TB) | Between ​Sat Dec 7, 04.00 and Mon Dec9 03.00 | 
-Dec 23.00 - 23.59 | Hb : remove Bank B module, insert Module 6 (16 TB) | | Sat Dec 7, 10.00 - 11.00 AM |+Dec 23.00 -> ? | Hb : remove Bank B module, insert Module 6 (16 TB) | | Sunday morning ​|
 | 6 Dec 18.28.32 - 8 Dec 18.15.40 | Recording to Module 5 (16 TB), Hb and Yg: Bank A; Ke: Bank B | | 6 Dec 18.28.32 - 8 Dec 18.15.40 | Recording to Module 5 (16 TB), Hb and Yg: Bank A; Ke: Bank B |
 | 8 Dec 18.16 - 18.20 | Yg : remove Bank A module, insert Module 7 (16 TB) | | 8 Dec 18.16 - 18.20 | Yg : remove Bank A module, insert Module 7 (16 TB) |
 | 8 Dec 18.16 - 18.20 | Ke : remove Bank B module, insert Module 7 (16 TB) | | 8 Dec 18.16 - 18.20 | Ke : remove Bank B module, insert Module 7 (16 TB) |
 +| | | | |
 | 8 Dec 18.20.40 - 10 Dec 18.07.48 | Recording to Module 6 (16 TB), Hb and Yg: Bank B Ke: Bank A | | 8 Dec 18.20.40 - 10 Dec 18.07.48 | Recording to Module 6 (16 TB), Hb and Yg: Bank B Ke: Bank A |
- +| 10 Dec 18.07.48 - 18.12.48 | Ke : Power down and remove Bank A module, insert blank 16 TB module into Bank A | Wed Dec 11, 03.37.48 AM | 
-| | Yg : remove Bank B module, insert Module 8 (16 TB) | +After 10 Dec, 18.08 UT | Yg : remove Bank B module, insert Module 8 (16 TB) | 
-| | Ke : remove Bank B module, insert Module 8 (16 TB) |+After 10 Dec, 18.08 UT Hb : remove Bank B module, insert Module 8 (16 TB) |
 | 10 Dec 18.12.48 - 12 Dec 18.00.00 | Recording to Module 7 (16 TB), Bank A | | 10 Dec 18.12.48 - 12 Dec 18.00.00 | Recording to Module 7 (16 TB), Bank A |
 | | Yg : remove Bank A module, insert Module 9 (16 TB) | | | Yg : remove Bank A module, insert Module 9 (16 TB) |
/home/www/auscope/opswiki/data/attic/operations/documentation_austral15day_module_swaps.1386212935.txt.gz · Last modified: 2013/12/05 03:08 by Jim Lovell