User Tools

Site Tools


operations:documentation_cont14_timetable

This wiki is not maintained! Do not use this when setting up AuScope experiments!

This is an old revision of the document!


Observation Timetable and Modules

Mark5 Nomenclature: “Bank swap” means changing where the data are recorded from one bank to the other. This does NOT mean modules are powered on/off or physically moved. “Module swap” means that a module is powered down, removed, replaced with a new one and powered up.

The “vsn?” section is filled by the local staff at the telescopes after the module has been inserted into the bank during the system check.

Start Date Obs Code Module Module capacity (TB)/vsn used Bank Module swap during
(UT) number Hb vsn? Ho vsn? Ke vsn? Yg vsn? system check?
06/05/2014 C1401 1 2 BKG-0057 2 BKG-0052 4 USN-0114 4 USN-0017 A No
07/05/2014 C1402 2 4 BKG+0141 2 USN-0178 6 USN-0072 6 HOB+0033 B Yes, Bank A
08/05/2014 C1403 No
09/05/2014 C1404 3 16 HOB+1010 6 HOB+0029 16 HOB+0098 16 HOB+0115 A Yes, Bank B
10/05/2014 C1405 No
11/05/2014 C1406 No
12/05/2014 C1407 No
13/05/2014 C1408 4 16 HOB+0105 6 HOB+0041 8 HOB+0088 8 HOB+0075 B Yes, Bank A
14/05/2014 C1409 No
15/05/2014 C1410 No
16/05/2014 C1411 5 8 PKS+0020 16 ???????? 16 HOB+0107 16 ???????? A Yes, Bank B
17/05/2014 C1412 No
18/05/2014 C1413 No
19/05/2014 C1414 No
20/05/2014 C1415 6 2 ???????? 0.9 ???????? 4 USN-0049 4 ???????? B Yes (spare goes in), Bank A

Data transfer to correlator destinations:

STATION  (total amount of data for the 5 rapid-like sessions)     RAID
Ht       (  6.5 TB )                                         -->   io03
Ke       ( 10.7 TB )                                         -->   io10
Ts       (  4.5 TB )                                         -->   io10b
Hb,Yg,Ny (8.9 TB, 11.1 TB, 8.1 TB respectively)              -->   io11
Ww       ( 10.2 TB )                                         -->   io06/7/8
Ft       ( 8.3 TB )                                          -->   sneezy1
Ho       ( 3.6 TB )                                          -->   sneezy2
/home/www/auscope/opswiki/data/attic/operations/documentation_cont14_timetable.1399851888.txt.gz · Last modified: 2014/05/11 23:44 by Martin Ephgrave