Previous revision
operations:documentation_ops2_pcfs9.10.5plus [2019/07/10 04:58]
Warren Hankey
operations:documentation_ops2_pcfs9.10.5plus [2020/09/21 05:49] (current)
Jamie McCallum [Monitoring Observations on the 26-m]
Line 1: Line 1:
 ====== Operator Documentation for observations ====== ====== Operator Documentation for observations ======
- 
 ====== Background ====== ====== Background ======
   * Background reading for new operators   * Background reading for new operators
Line 16: Line 15:
     * [[operations:​maps|Maps]]     * [[operations:​maps|Maps]]
 ===== IVS Observation Instructions ===== ===== IVS Observation Instructions =====
 +
 +**[[operations:​documentation_ops2_pcfs9.10.5plus:​offsite|Off-site experiment monitoring notes]]**
  
 Below are the links to a step-by-step procedure for making IVS observations on the 12m and 26mtelescopes. The current version of e-RemoteCtrl has a built-in checklist which can now be used during the setup procedure. So the first task is to start the Observing and monitoring software at each site, then e-RemoteCtrl. Below are the links to a step-by-step procedure for making IVS observations on the 12m and 26mtelescopes. The current version of e-RemoteCtrl has a built-in checklist which can now be used during the setup procedure. So the first task is to start the Observing and monitoring software at each site, then e-RemoteCtrl.
Line 27: Line 28:
     * [[operations:​documentation.eremotecontrol_checklist_midob26]|26-m checklist parameter description]]     * [[operations:​documentation.eremotecontrol_checklist_midob26]|26-m checklist parameter description]]
  
-  * [[[operations:​AUM-hb|New procedures for the AUM experiments ​and the Hobart12 (Hb) telescope]]+  * [[[operations:​AUM-hb|New procedures for the Mixed-Mode (AUMexperiments ​with Hobart12 (Hb) and Katherine (Ke) telescopes]]
  
 ==== Monitoring Observations on Parkes 64-m ==== ==== Monitoring Observations on Parkes 64-m ====
Line 186: Line 187:
 ==Before Setup:== ==Before Setup:==
  
-**1. Drudg schedule for the experiment (if it has not been done already)**. ​ Drudg the schedule using ''​slogit.auscope.sh''​ on ops-serv2 as for the other stations. ​+**1. Before you drudg, start the correct fs-mk5hb (fs-auscope?​) for IVS  which runs a script to select the correct backend (mk5 and DBBC). Drudg schedule for the experiment (if it has not been done already)**. ​ Drudg the schedule using ''​slogit.auscope.sh''​ on ops-serv2 as for the other stations. ​Having the backend selected correctly will result in the correct proc file being generated.  ​
  
 From ops8, confirm that the sum file has been copied across to ''/​vlbobs/​ivs/​sched/''​. Otherwise, ssh into hobart (''​ssh oper@hobart''​) and copy the .sum file with the command <​code>​scp /​tmp/​sched.tmp observer@ops-serv2:/​vlbobs/​ivs/​sched/​aug019ho.sum</​code>​. From ops8, confirm that the sum file has been copied across to ''/​vlbobs/​ivs/​sched/''​. Otherwise, ssh into hobart (''​ssh oper@hobart''​) and copy the .sum file with the command <​code>​scp /​tmp/​sched.tmp observer@ops-serv2:/​vlbobs/​ivs/​sched/​aug019ho.sum</​code>​.
Line 212: Line 213:
 ==Setup of Telescope:​== ==Setup of Telescope:​==
  
-**Step 1.** Open a VNC viewer to newsmerd <​code>​vncviewer newsmerd:​1</​code> ​ The password is the usual one. (hobart26 FS runs on computer named hobart). If this is not accessible ssh to observer@newsmerd then restart the vnc with <​code>​x11 -shared ​-alwaysshared -forever -usepw -display :1 & </​code>​+**Step 1.** Open a VNC viewer to newsmerd <​code>​vncviewer newsmerd:​1</​code> ​ The password is the usual one. (hobart26 FS runs on computer named hobart). If this is not accessible ssh to observer@newsmerd then restart the vnc with <​code> ​vncserver :1 -shared & </​code>​
  
 **Step 2.** Check that the field system is running on newsmerd. ​ Usually, the Geodesy window will be Desktop 4. If it is not running, please start it with ''​fs-mk5hb''​ to ensure that the geodetic backend is selected. ​ **Step 2.** Check that the field system is running on newsmerd. ​ Usually, the Geodesy window will be Desktop 4. If it is not running, please start it with ''​fs-mk5hb''​ to ensure that the geodetic backend is selected. ​
Line 310: Line 311:
 ==== Monitoring Observations on the 26-m ==== ==== Monitoring Observations on the 26-m ====
  
-  * Please note that e-RemoteControl ​does not adequately show the recorded/​free space on module in mkvTo see how full is the module, please use commands //​mk5=bank_set//​ (module capacity) and //​disk_pos//​ (write pointer position).+  * Please note that e-RemoteControl ​is now longer supported and will not connect to the field system! 
 +  * Instead, please use ''​stream_log ho''​ to create ​local file for the log monitor 
 +  * Checklists now have to be manually triggered with ''​checklistHo $exper''​ (where ''​$exper'' ​is the experiment name) - to launch the start or end checklists, please use ''​checklistHo $exper start''​ or ''​checklistHo $exper stop''​ repectively
   * Parameters of the check-list during observation for 26-m are [[operations:​documentation.eremotecontrol_checklist_midob26|explained here]].   * Parameters of the check-list during observation for 26-m are [[operations:​documentation.eremotecontrol_checklist_midob26|explained here]].
  
/home/www/auscope/opswiki/data/attic/operations/documentation_ops2_pcfs9.10.5plus.1562734731.txt.gz · Last modified: 2019/07/10 04:58 by Warren Hankey