This shows you the differences between two versions of the page.
Both sides previous revision Previous revision Next revision | Previous revision | ||
operations:monitoring.ivs.etransfer [2015/03/26 02:23] liza |
operations:monitoring.ivs.etransfer [2015/03/26 20:52] (current) liza |
||
---|---|---|---|
Line 9: | Line 9: | ||
**How to monitor e-transfers:** | **How to monitor e-transfers:** | ||
+ | |||
+ | If on top of the page of Handover Notes you see the following text: | ||
+ | |||
+ | |||
+ | |||
+ | |||
+ | <note important>**Achtung! R1 TRANSFER IN PROGRESS! MONITORING REQUIRED!**</note> | ||
+ | R1 monitoring instructions: [[operations:monitoring.ivs.etransfer|operations:monitoring.ivs.etransfer]] | ||
+ | |||
+ | |||
There are two options: either have the transfer window running somewhere on the screen during all the time of your shift, or check it roughly every two hours together with the check lists. In any case, the procedure is the following: | There are two options: either have the transfer window running somewhere on the screen during all the time of your shift, or check it roughly every two hours together with the check lists. In any case, the procedure is the following: |