User Tools

Site Tools


operations:monitoring.ivs.etransfer

This wiki is not maintained! Do not use this when setting up AuScope experiments!

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
operations:monitoring.ivs.etransfer [2015/03/26 02:23]
liza
operations:monitoring.ivs.etransfer [2015/03/26 20:52] (current)
liza
Line 9: Line 9:
  
 **How to monitor e-transfers:​** **How to monitor e-transfers:​**
 +
 +If on top of the page of Handover Notes you see the following text:
 +
 +
 +
 +
 +<note important>​**Achtung! R1 TRANSFER IN PROGRESS! MONITORING REQUIRED!**</​note>​
 +R1 monitoring instructions:​ [[operations:​monitoring.ivs.etransfer|operations:​monitoring.ivs.etransfer]]
 +
 +
  
 There are two options: either have the transfer window running somewhere on the screen during all the time of your shift, or check it roughly every two hours together with the check lists. In any case, the procedure is the following: There are two options: either have the transfer window running somewhere on the screen during all the time of your shift, or check it roughly every two hours together with the check lists. In any case, the procedure is the following:
/home/www/auscope/opswiki/data/attic/operations/monitoring.ivs.etransfer.1427336604.txt.gz · Last modified: 2015/03/26 02:23 by liza