User Tools

Site Tools


operations:monitoring.ivs.etransfer

This wiki is not maintained! Do not use this when setting up AuScope experiments!

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
operations:monitoring.ivs.etransfer [2015/03/26 20:50]
liza
operations:monitoring.ivs.etransfer [2015/03/26 20:52] (current)
liza
Line 12: Line 12:
 If on top of the page of Handover Notes you see the following text: If on top of the page of Handover Notes you see the following text:
  
-// 
  
- 
-<note important>​**Achtung! 
-R1 TRANSFER IN PROGRESS! MONITORING REQUIRED!**</​note>​ 
- 
-// 
  
  
 +<note important>​**Achtung! R1 TRANSFER IN PROGRESS! MONITORING REQUIRED!**</​note>​
 R1 monitoring instructions:​ [[operations:​monitoring.ivs.etransfer|operations:​monitoring.ivs.etransfer]] R1 monitoring instructions:​ [[operations:​monitoring.ivs.etransfer|operations:​monitoring.ivs.etransfer]]
  
/home/www/auscope/opswiki/data/attic/operations/monitoring.ivs.etransfer.1427403049.txt.gz · Last modified: 2015/03/26 20:50 by liza