This shows you the differences between two versions of the page.
Both sides previous revision Previous revision Next revision | Previous revision | ||
handover:a1409 [2014/09/14 22:55] Vasaant Krishnan |
handover:a1409 [2014/09/15 03:49] (current) Vasaant Krishnan |
||
---|---|---|---|
Line 4: | Line 4: | ||
* Start disk position: 0 GB (VSN: HOB+0127) | * Start disk position: 0 GB (VSN: HOB+0127) | ||
+ | * Halting schedule at DOY/UT 258/01:00, scan 258-0101, source OJ287 for system checks. Also inserted 2TB module into Bank B as USN-0201. | ||
+ | * 258-0134 9901 0648-165 276 31 NEUTR 01:34:35 01:35:13 0:38 5360.5 | ||
+ | * Schedule resumed at UT 01:34, but mk5 recording error of some sort | ||
+ | * Halted schedule at UT 01:39 to fix mk5hb issue | ||
+ | * Restart scheduled UT 01:48. mk5 recording successful | ||
+ | * Schedule stopped again at UT 01:51 for spaceX test | ||
+ | * Schedule resumed at UT 02:15. First source is to be nrao530. Est. data deficiency is 341 GB | ||
Ke: | Ke: |