This shows you the differences between two versions of the page.
Both sides previous revision Previous revision Next revision | Previous revision Next revision Both sides next revision | ||
handover:r1706 [2015/09/21 13:33] Ross Turner |
handover:r1706 [2015/09/22 16:18] Ross Turner |
||
---|---|---|---|
Line 3: | Line 3: | ||
**Hobart 26m** | **Hobart 26m** | ||
- | Module: HOB+1004, start pos: 3883 GB | + | Module: HOB+1004, start pos: 4819.273 GB |
- | * scan 261-0351a did not record any useful data due to slewing error (Imogen) | + | Windstowed 0436-052 (JMc) |
**Katherine** | **Katherine** | ||
- | Module: HAY-0062, start pos: 159 GB | + | Module: HAY-0062, start pos: 159.511 GB |
+ | |||
+ | Network interruption at ~0300 with associated clock break - likely a brief power glitch. pps_delay through dbbc showed slippage between 0300 and 0315 although no dot? errors. Reconfigured DBBc at 0315, schedule resumed at 0320. (JMc) | ||
+ | |||
+ | Scans affected: 265-0258 to 265-0318 | ||
+ | |||
+ | 2015.265.16:12:01 ALARM: Delay through DBBC has changed. Scans 265-1611a through 1615b affected (Ross). | ||
- | * 0710 UT pointings done | ||
**Yarragadee** | **Yarragadee** | ||
- | Module: USN-0036, start pos: 140 GB | + | Module: USN-0036, start pos: 140.456 GB |
- | * 0710 UT pointings done | ||
{{tag>}} | {{tag>}} |