This shows you the differences between two versions of the page.
Both sides previous revision Previous revision Next revision | Previous revision Next revision Both sides next revision | ||
handover:r4657 [2014/10/16 19:08] Vasaant Krishnan |
handover:r4657 [2014/10/17 04:11] Vasaant Krishnan |
||
---|---|---|---|
Line 9: | Line 9: | ||
* 18:30 UT - Experiment started OK (VK) | * 18:30 UT - Experiment started OK (VK) | ||
* Steep slopes across channels 5,11 and 12 in autocorrelations. | * Steep slopes across channels 5,11 and 12 in autocorrelations. | ||
+ | * 23:10 UT: Tsys steady at 200K in band 09 (RT). | ||
+ | * 04:05 UT: Module in bank A swapped, not yet checked (RT). | ||
Line 15: | Line 17: | ||
* 18:30 UT - Experiment started OK (VK) | * 18:30 UT - Experiment started OK (VK) | ||
* Steep slope across final channel in autocorrelations. | * Steep slope across final channel in autocorrelations. | ||
+ | * 02:40 UT: Network connection to Yarragadee failed (RT). | ||
+ | * 03:08UT: Network restored. One router in the chain was not passing the packets through the VPN; rebooted router; problem solved. (Imogen) | ||
+ | * 03:30 UT: Tsys has been low in band 11 for several hours at least (60 K) (RT). | ||
{{tag>}} | {{tag>}} |