====== Katherine To Do ====== | ====== Katherine To Do ====== | ||
+ | |||
+ | * Phase cal testing (temperature stabilisation? Bad filters?) | ||
+ | * DBBC service - check cables, internal connections, bad boards) | ||
+ | * earthing of DBBC and MK5 units | ||
+ | * DBBC cont cal - tune for ~2-5% CONT CAL, 5-10% pulsed CAL | ||
+ | * CONT CAL seems to be triggered when PULSED CAL is? Check wiring on spare board? | ||
+ | * Y-factor tests - get all CAL factors via DBBC. | ||
+ | * control room temp sensors - MoniCA | ||
+ | * twister cable suspender | ||
+ | * <del>fix UPS</del> | ||
+ | * pedestal and maser room fan, fix/replace | ||
+ | * <del>webcam clean</del> | ||
+ | * Upgrade mk5-2ke. Replace module back plane | ||
+ | * Back up all PCs | ||
+ | * <del>Maser service.</del> | ||
+ | * tidy ptz wiring | ||
+ | * <del>clean all sky cam lens</del> | ||
+ | * check for rodents in genset | ||
+ | * generator battery charger reduce electrolyte boiling | ||
+ | * feed temp/press sensor | ||
+ | * weed control | ||
+ | * insect proofing of the hub | ||
+ | * <del>pedestal base flange seal</del>, recoat with paving paint | ||
+ | * <del>grooves in concrete foundation to promote drainage</del> | ||
+ | * remove rust from container and paint | ||
+ | |||
* Feed tube | * Feed tube | ||
- | * <del>Install hatch handle</del> | ||
- | * <del>Install receiver and cal plates</del> | ||
- | * <del>cabling from receiver box to feed tube</del> | ||
* <del>test</del> | * <del>test</del> | ||
* Hub | * Hub | ||
- | * <del>Install dehumidifier and test 'gimbal' mechanism.</del> Look at antenna step-response with CTScope | + | * Look at antenna step-response with CTScope |
* Replace fan on RF box | * Replace fan on RF box | ||
* Pedestal | * Pedestal | ||
* <del>Evict wildlife</del> | * <del>Evict wildlife</del> | ||
+ | * drain spare conduit | ||
* <del>Modify controller setting to accept remote resets, and test</del> | * <del>Modify controller setting to accept remote resets, and test</del> | ||
* Antenna structure | * Antenna structure | ||
* <del>Put close-outs around elevation jack once cabling, installation and testing is complete</del> | * <del>Put close-outs around elevation jack once cabling, installation and testing is complete</del> | ||
* Generator | * Generator | ||
- | * <del>Fix fuel tank</del> | ||
- | * <del>New (2nd hand) starter motor, wrong one.</del> Get new one from India. <del>Fit Hobart one.</del> | ||
- | * <del>test</del> | ||
* <del>Connect remote monitoring of diesel running and 'not in auto'</del> | * <del>Connect remote monitoring of diesel running and 'not in auto'</del> | ||
- | * <del>Repalce Az gearbox oil</del> | ||
* Site | * Site | ||
* <del>Remove rubbish</del> | * <del>Remove rubbish</del> | ||
+ | * weeding and mowing | ||
+ | * shelter above container | ||
* hardware | * hardware | ||
* <del>Confirm full set of spares</del>, record serial numbers | * <del>Confirm full set of spares</del>, record serial numbers | ||
* Control room equipment | * Control room equipment | ||
- | * <del>Do we need another IPS?</del> No. | ||
- | * <del>Install DBBC</del> | ||
- | * <del>Check cables and cards are securely connected, check for signs of damage</del> | ||
- | * <del>Turn on and see if it works :-)</del> | ||
- | * <del>Run Gino's calibration procedure</del> | ||
- | * <del>Install Ops PC</del> | ||
- | * <del>Fire up Rubidium and Frequency Comparator, monitor stability</del> Fail. | ||
- | * <del>Install second power meter, check comms with PCFS</del> | ||
* Set up suitable backup mechanism for timing PC (in case of disk failure) | * Set up suitable backup mechanism for timing PC (in case of disk failure) | ||
* RF/IF testing | * RF/IF testing | ||
Line 46: | Line 60: | ||
* <del>Determine gross pointing offsets and obtain a zeroth-order model (Jim)</del> | * <del>Determine gross pointing offsets and obtain a zeroth-order model (Jim)</del> | ||
* <del>Measure SEFD at all bands. Should be ~2500 Jy</del> | * <del>Measure SEFD at all bands. Should be ~2500 Jy</del> | ||
- | * Fringe check to Hobart | + | * <del>Fringe check to Hobart</del> |
* Software | * Software | ||
* Confirm PCFS can talk to: | * Confirm PCFS can talk to: | ||
Line 91: | Line 105: | ||
* Listening to the drives | * Listening to the drives | ||
* MASER list | * MASER list | ||
- | * <del>Get prices from TechRentals for hire of equip</del> | ||
- | * <del>check availability of He at MR engineering</del> | ||
* <del>check PLL battery fault cause</del> | * <del>check PLL battery fault cause</del> | ||
* | * | ||
* breid List | * breid List | ||
- | * <del>Exhaust extension for generator</del> | ||
* Dehydrator | * Dehydrator | ||
- | * <del>Network comms</del> | ||
- | * <del>Air-line upwards</del> | ||
* Dehumidifier | * Dehumidifier | ||
- | * <del>Cable ties in the feed</del> | + | * Eye-bolt in the cone |
- | * <del>Door in the feed</del> | + | * Wash Subreflector |
- | * <del>Eye-bolt in the cone</del> | + | |
- | * <del>Wash Subreflector</del> | + | |
* Doors in Hub, <del>trim</del> and cutouts, <del>fit</del> | * Doors in Hub, <del>trim</del> and cutouts, <del>fit</del> | ||
* Rod and hook for retrieving fall arrester | * Rod and hook for retrieving fall arrester | ||
+ | * eye bolt for fall arrester | ||
* <del>Phase Cal xdB - Sband 1dB</del> | * <del>Phase Cal xdB - Sband 1dB</del> | ||
* UPS | * UPS | ||
* Maser battery PLL fault | * Maser battery PLL fault | ||
+ | * run a sych and 100MHz rg58 coax | ||
* Camera | * Camera | ||
* <del>Lightning arrestor</del> | * <del>Lightning arrestor</del> | ||
+ | * focus | ||
* <del>Lens: clean and check</del> | * <del>Lens: clean and check</del> | ||
* <del>Install window blind</del>s | * <del>Install window blind</del>s | ||
Line 118: | Line 128: | ||
* back shell on wind stow connector | * back shell on wind stow connector | ||
* <del>EL encoder offset parameters</del> | * <del>EL encoder offset parameters</del> | ||
- | * <del>Send back cherry picker</del> | ||
* <del>Send back excess stuff such as nuts and bolts for Yarragadee</del> | * <del>Send back excess stuff such as nuts and bolts for Yarragadee</del> | ||
* <del>Raise fall arrest inertia reel</del> | * <del>Raise fall arrest inertia reel</del> | ||
Line 127: | Line 136: | ||
* <del>Label equipment</del> | * <del>Label equipment</del> | ||
* Label supension files containing equipment manuals | * Label supension files containing equipment manuals | ||
- | * Sun shield for melted box at power inlet to donga | + | * oil change in az gear boxes and check/fix cause of leak |
- | * | + | * sort generator battery and charging system |
+ | * oil change generator | ||
+ | * painting pedestal rust spots | ||
+ | * painting container rust spots | ||
+ | * Thermal sensors calibrate | ||
+ | * Sort mark5 earthing and other problems | ||